Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here
Sign InSign Up

Solar Faqs

Solar Faqs Logo Solar Faqs Logo
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Contact Us
Supported By
Home/ Questions/Q 371
Next
In Process
aalan

Solar Faqs Latest Questions

Sharma
  • 1
Sharma
Asked: June 12, 20242024-06-12T11:57:45+05:30 2024-06-12T11:57:45+05:30

How long does the solar system installation process typically take?

  • 1
How long does the solar system installation process typically take?
Share
  • Facebook

    1 Answer

    • Voted
    • Oldest
    • Recent
    1. Prasanna Singh
      Prasanna Singh
      2024-06-12T12:03:04+05:30Group Editor, Saur Energy International | Answer on June 12, 2024 at 12:03 pm

      It mainly depends on the promptness of the local discoms in granting persmissions, the cooperation of your vendor and the response of the National Rooftop Portal in processing the response. In case there is no meter load enchancement need, the whole process usually takes 30-60 days in most states. In states like Gujarat the whole process often gets done within one month. In case a person wants to increase the sanctioned capacity, this process alone takes one extra month besides normal rooftop solar installation time. But the meter load enchacement request is often made before applying for rooftop solar.

      • Reply
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp
    Leave an answer

    Leave an answer
    Cancel reply

    Sidebar

    Experts Panelist

    Swapanil Wakade, Ecofy

    Swapanil Wakade, Ecofy

      Sai Charan Kuppili, Jinko Solar

      Sai Charan Kuppili, Jinko Solar

        Manjunath AR Global Product Manager, Fimer

        Manjunath AR Global Product Manager, Fimer

          Questions Categories

          Solar Module
          Policy and Schemes
          Solar Inverter
          O&M
          Solar Structure
          Solar Plant
          Renewable Energy
          Supported By

          Footer

          © 2024. All Rights Reserved.