Under PM Surya Ghar, the govt gives upto Rs 78.000 for a 3KW rooftop solar system and upto Rs 30,000 per Kw for systems below 3 KW. For those going above 3 Kw there are no additional subsidies as the benefits are capped upto 3 KW. In addition to the central subsdies, you get additional subsidies froRead more
Under PM Surya Ghar, the govt gives upto Rs 78.000 for a 3KW rooftop solar system and upto Rs 30,000 per Kw for systems below 3 KW. For those going above 3 Kw there are no additional subsidies as the benefits are capped upto 3 KW. In addition to the central subsdies, you get additional subsidies from states too. Check out your additional state subsidies from your local discom or energy department.
See less
It mainly depends on the promptness of the local discoms in granting persmissions, the cooperation of your vendor and the response of the National Rooftop Portal in processing the response. In case there is no meter load enchancement need, the whole process usually takes 30-60 days in most states. IRead more
It mainly depends on the promptness of the local discoms in granting persmissions, the cooperation of your vendor and the response of the National Rooftop Portal in processing the response. In case there is no meter load enchancement need, the whole process usually takes 30-60 days in most states. In states like Gujarat the whole process often gets done within one month. In case a person wants to increase the sanctioned capacity, this process alone takes one extra month besides normal rooftop solar installation time. But the meter load enchacement request is often made before applying for rooftop solar.
See less