ALMM restrictions, effective April 1, apply to almost all solar projects. The only exception they effectively allow is for off grid projects, where you are not using the grid at all. Captive projects, since they are connected to the grid, are not exempt anymore.
ALMM restrictions, effective April 1, apply to almost all solar projects. The only exception they effectively allow is for off grid projects, where you are not using the grid at all. Captive projects, since they are connected to the grid, are not exempt anymore.
See less
Structural engineering certificate Roof-specific load calculation and anchorage drawings Warranty details for the structure Audit reports, if available
Structural engineering certificate
Roof-specific load calculation and anchorage drawings
Warranty details for the structure
Audit reports, if available